NEW QUESTION 59
For optical fiber cabling, which of the following test instruments is used to locate and identify any anomalies?
- A. OLTS
- B. Spectrum analyzer
- C. Optical power meter
- D. OTDR
Answer: D
NEW QUESTION 60
Program A is dependent upon program B lo complete benefits sustainment for two benefits Program A is on track to meet program benefits However program B's program manager has just advised that program B has been closed.
What should program A's program manager update and review first with the stakeholders?
- A. Benefits sustainment plan
- B. Benefits transition plan
- C. Benefits register
- D. Benefits management plan
Answer: A
NEW QUESTION 61
Based on the estimated work area size, what is the MAXIMUM number of work areas that a telecommunications enclosure shall serve?
- A. 0
- B. 1
- C. 2
- D. 3
- E. 4
Answer: B
NEW QUESTION 62
Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)
- A. Require more installation time than aerial or direct-buried installations
- B. Route planning is not as critical as aerial or direct-burial
- C. Not adaptable for future facility placement or removal without disturbing the property
- D. Economical over a long life
- E. Provide additional physical cable protection
Answer: D,E
NEW QUESTION 63
A program manager joins a learn to fix a troubled enterprise-wide customer relationship management (CHM) system Analysis indicates that duplicate customer information data is resulting in redundant client information.
The program manager accesses the knowledge repository tor similar programs to gather historical data and trends. A corrective action is identified, and a change in process is implemented to regain data integrity What should the program manager do with the knowledge gained from this activity?
- A. Update the communications management plan
- B. Update the lessons learned database
- C. Communicate the corrective action to the program sponsor
- D. Include the lessons learned in the weekly program report
Answer: B
NEW QUESTION 64
The transfer of unwanted signals may occur over one path or several paths. What method addresses the mitigation or suppression of unwanted signals?
- A. Mounting heights in racks and cabinets
- B. Signal coupling
- C. The use of unshielded cables
- D. Bonding and grounding
Answer: D
NEW QUESTION 65
A program manager is working with the sponsor, stakeholders, and steering committee to formulate a program's benefits sustainment and transition plan What should the program manager do to create this plan?
- A. Identify key measures to compare expected benefits in the benefits management plan with actual performance once benefits sustainment and program transition starts
- B. Update the benefits management plan, and provide a copy to the organization responsible for measuring the sustainment period
- C. Interview stakeholders and revise the benefits management plan to provide new insight into the program's execution and benefits sustainment period
- D. Assign creation of the benefits sustainment plan to the organization responsible for monitoring and controlling the sustainment period
Answer: B
NEW QUESTION 66
A design build firm has been retained by a client to construct an outpatient clinic. The client has hired an ICT distribution designer to review the DB firm's work product ensuring that the certified (mat documents are complete. In what capacity would the designer MOST LIKELY be serving?
- A. Quality Control (QC)
- B. Project Management (PM)
- C. Quality Assurance (QA)
- D. ICT Designer of Record (DOR)
Answer: C
NEW QUESTION 67
An Ethernet passive optical network (EPON) uses an aggregation device called an optical line terminal (OLT).
An OLT can support a MINIMUM of______subscribers per port using a passive optical splitter
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION 68
Status information, including program and component status, cost information, risk analysis and other relevant information, is provided in which of the following?
- A. Information gathering and retrieval system
- B. Program performance report
- C. Communications management plan
- D. Communications log updates
Answer: B
NEW QUESTION 69
An ICT distribution designer installed a 50/1 ?5 mm/1300 nm fiber optic cable from Building A to identical Building B with a distance of 600 m (1968 ft) At Building B.
The designer fusion splice this new cable to an existing identical 50/126 mm fiber optic cable that runs 800 m (2525 ft) to Building C.
Both ends are terminated with SC connectors. What is the loss budget for the above fiber link?
- A. 2.95 dB
- B. 3.40dB
- C. 3.90 dB
- D. 4.35 dB
Answer: C
NEW QUESTION 70
A program manager notices that one project manager tends to withdraw during important team discussions to avoid conflict. What technique could the program manager use to gam more input from this project manager?
- A. Institute an incentive program to create competition among the team members.
- B. Make the project manager share an office with a more assertive team member
- C. Create an online message board so team members can see and respond to everyone's ideas
- D. Solicit ideas from each team member individually, giving each person a chance to express their opinions
Answer: D
NEW QUESTION 71
A global enterprise resource planning (ERP) program's scope includes designing and building a global template. Plans include a pilot implementation project to validate the template, to be followed by several rollout projects. During the build of the global template, a new government regulation mandates implementation of a goods and services tax (GST).
What should the program manager update?
- A. Benefits management plan
- B. Stakeholder engagement plan
- C. Benefits transition plan
- D. Program communications management plan
Answer: A
NEW QUESTION 72
What step can be a phase of the Bidding and Negotiating process?
- A. Creating a response evaluation
- B. Identifying any conflicts that may become apparent
- C. Prepare necessary change orders
- D. Identifying potential value engineering opportunities
Answer: A
NEW QUESTION 73
The customer of a three-year program does not want to receive any intermediate details on the program. The program appears to be in trouble and the customer is concerned about a new system's cost. The program manager has provided monthly performance reports throughout the program's lite cycle.
Which of the following would the customer be interested in reviewing?
- A. Cost performance index
- B. Estimate at completion
- C. Original cost baseline
- D. Estimate to complete
Answer: B
NEW QUESTION 74
An organization requests that a junior project manager, with no previous experience or training in the industry take over a complex program component. The program component involves senior subject matter experts and has dependencies with other large projects to deliver key benefits to the organization.
How should the junior project manager respond to this request?
- A. Reject the assignment because of fear of failure and resulting negative career impact
- B. Accept the assignment as a challenge and an opportunity to acquire new skills and seek advice from a senior project manager
- C. Reject the assignment, because of the ethical requirement not to accept work for which the project manager is not qualified
- D. Accept the assignment, identify the skill gaps and request training
Answer: C
NEW QUESTION 75
What's the MINIMUM depth of a trench from top of the cable/conduit to final grade? (Select two options.)
- A. 1270 mm (50 in)
- B. 610 mm (24 in)
- C. 305 mm(12 in)
- D. 914 mm (36 in)
- E. Below the area's 50-year frost line
Answer: B,E
NEW QUESTION 76
What is the MINIMUM distance from the edge of a pool or other water hazards for a weatherproof enclosure?
- A. 1 m (3 ft)
- B. 2 m (7 ft)
- C. 10 m (30 ft)
- D. 6 m (20 ft)
- E. 4 m (13 ft)
Answer: D
NEW QUESTION 77
The program director of a four-year program, estimated to require 600.000 person-days effort, notices that team morale has decreased over the last three months. The program is at a critical stage with 70% completion through the last phase. A number of defects are found that result in teams working additional hours. The program director requests that the program management office (PMO) gather metrics to monitor the situation Which of the following metrics should the PMO capture on a monthly basis?
- A. Amount of hours spent on rework of software coding retesting, and on non-rework activities
- B. Absenteeism rate staff turnover quantity of defects, total hours worked average number of FTEs
- C. Absenteeism rate staff turnover and leave liability
- D. Billable hours charged to the program, non-billable hours charged to the program, quantity of defects per full-time equivalent (FTE)
Answer: B
NEW QUESTION 78
Exhibit:
A pay telephone using coins needs to be installed in a public area. In the specifications, it is required that the telephone shall meet the ADA (Americans with Disability Act) requirement for side reach using a wheelchair.
What will be the maximum reachable height or the value of "X"?
- A. 864 mm (34 in)
- B. 760 mm (30 in)
- C. 1220 mm (48 in)
- D. 1170 mm (46 in)
- E. 1370 mm (54 in)
Answer: E
NEW QUESTION 79
To increase its presence and promote its products and services in new markets, a company begins to implement its new business strategy. The company's CEO endorses a new program to promote and support this strategy However before the program is formally initialed, this strategy must be aligned with the organization's strategic goals and objectives.
What should the program manager develop first?
- A. Program risk management plan
- B. Program resource management plan
- C. Program risk and issue governance forum
- D. Program's risk threshold
Answer: D